(7232) 29-33-75 fax: (7232) 29-33-76

UKCP’s history

1959 – first capacitors were produced;
1962 – first capacitor banks and coupling capacitors were mastered;
1985 – all produced capacitors are impregnated with ecological safety fluids;
1992 – a change from a state company into a private form of property and became OJSC "UKCP";
2002 – products attestation in "UES of Russia", RJSC;
2004 – receipt of ISO certificate of compliance 9001:2008 by international certified company KEMA (in 2010 a second recertification with a certificate receipt of KEMA Quality ISO 9001:2008 from DEKRA company)
High technological automatic equipment of Japanese Company "Amada" was purchased;
2005 – "EnSERTIKO" certificate receipt to supply the products to the electric power engineering companies of Russia, certificate receipt about accreditation and entering into the Register of potential suppliers of products of OJSC "Rosenergoatom Concern", "Transneft".

The following were mastered and put into production:

  • High-Voltage Capacitor Banks Upgraded;
  • Low-Voltage Capacitor Banks, Multistep, Adjustable, Modified;
  • Furnace Capacitors with power up to 3000 kvar;

2006 – purchasing of equipment set for coating and polymerization of polymer paints on all cabinet products;

  • Development of Modules for Complete Capacitor Banks Installation for oil and gas complex;
  • Receipt of technical certificate of Belarusian State Energy Concern "BELENERGO" for a compliance with regulatory and industry documents on the operation of energy facilities of the Belarusian energy system;


  • Automatic Winding Equipment of "Synthesis" Company has been implemented;
  • Purchasing of High-performance, high-precision hydraulic shears of "AMADA" company, for optimum cutting result;

The following were mastered:

  • High-Voltage Capacitor Banks with Automatic Power Control;
  • Low-Voltage Filter Capacitor Banks;
  • Capacitive Voltage Dividers;

2008 – Small sized units of "Tesar Engineering" Company were implemented;

  • Batteries of Static Capacitors and Low-Voltage Capacitors up to 1000 V were developed and implemented in production;

2009 – "UKCP" JSC celebrated it's 50-years old anniversary;
2010 – participation in VII Forum of Interregional Cooperation of the Republic of Kazakhstan and Russian Federation with participation of the Heads of States;
2011 – The following was implemented:

  • Automatic winding-testing complex "OPTIMA-500" of HILTON Company, USA;
  • Welding machine of Varstroj Company (Slovenia);
  • Welding equipment of "INSPROS ENGINEERS PVT LTD" Company for insulators welding to the cap of high-voltage capacitor;
  • Manufacturing of first pilot samples of capacitive voltage transformers CVT -110÷750 kV;

2012 – Hydraulic sheet bending press with high accuracy of "AMADA" Company, 170 tons;
2013 – "Ust-Kamenogorsk Capacitor Plant" Joint-Stock Company was reorganized into Limited Liability Company.

Contact Information
  • Maldybayev str. 1, Ust-Kamenogorsk city, East-Kazakhstan reg.,
    Republic of Kazakhstan, 070001
  • Phone: +7 (7232) 29-33-75
    Fax: +7 (7232) 29-33-76
  • e-mail: kvar@ukcp.kz
Official Representative Office in Moscow
  • OJSC “Ust-Kamenogorsk Capacitor”
    Barabanniy str. 4, Moscow, Russian Federation, 107023
  • Phone: +7 (495) 964-97-89
  • e-mail: msorokina@ukkm.ru