On October 27, 2021, two Static Capacitor Banks (SCB 24-8.1 U2) of UKCP production were mounted and launched at Tamga substation 20/110/24/10 kV, Republic of Kyrgyzstan. Customer is JSC “National Electric Grid of Kyrgyzstan”.
Author: ukkzzavod7418435
Static Capacitor Banks at the Kondomskaya substation
In 2021, the installation of Static Capacitor Banks SCB -110-10 UHL1 and SCB-110-30 UHL1 manufactured by “UKCP”, Ltd. at the Kondomskaya 110/35/6 kV substation, Kemerovo Region, Russia was completed.